Hospital disaster preparedness

Five Days at Memorial

Hospital disaster preparedness is the capacity to protect patients and sustain care when a disaster overwhelms ordinary hospital operations. In the account of Hurricane Katrina, it is tested not by the existence of plans alone but by whether a hospital can keep power, water, oxygen, communications, and transport available when its surroundings fail. The crisis in New Orleans showed how familiar hazards, incomplete preparation, and fragile systems could converge; the contrasting experience at Charity Hospital and later improvements at Ochsner Baptist Medical Center show that preparedness also depends on practical investments and the ability to organize people under pressure.

Planning, standards, and the hazards identified

Preparedness planning in Louisiana had been shaped by a history of warnings and by exercises intended to make a catastrophe foreseeable. The Hurricane Pam exercise modeled a major hurricane striking New Orleans, including the presence of more than two thousand hospital patients. Yet officials had not worked out how to move so many patients to safety in a flood, and federal health officials had not taken part in the latest planning sessions. The exercise could describe the scale of the problem without resolving its central operational question: who would move dependent patients, by what means, and before roads and hospitals became inaccessible.

Hospitals also operated within an accreditation and regulatory environment that did not guarantee protection from local hazards. Memorial Medical Center underwent an accreditation survey in May 2005. At the time, accreditation by the organization then known as JCAHO could serve in Louisiana in place of the health department’s annual re-survey. That arrangement made accreditation consequential, but a survey and an emergency plan could not substitute for resilient infrastructure or a workable evacuation system. Memorial’s hazard vulnerability analysis was essentially a three-page form modeled on a published template, while federal emergency-preparedness rules for participating health-care facilities remained delayed. By July 2013, the proposed federal rule had still not been issued; observers reported resistance to potentially costly requirements, and gaps in preparedness remained.

Experience elsewhere had already offered a warning about hospitals on flood-prone ground. Tropical Storm Allison had flooded a hospital, and the subsequent lesson was blunt: a hospital built on a flood plain should not treat flooding as an unforeseeable event. Lawsuits followed hospital losses and disputes over floodwater management. The account sets these precedents beside the Katrina failures to underline that exposure to water was not an unknowable risk. The harder question was whether institutions converted known exposure into funded changes, protected equipment, and plans that could be carried out.

Memorial’s known vulnerabilities

After Hurricane Ivan narrowly missed New Orleans in September 2004, Memorial leaders reviewed hurricane plans. Plant operations director Eric Yancovich studied storm-surge models and estimated that a severe hurricane could bring twelve to fifteen feet of water around the hospital, which sat three feet below sea level. He also made a hand-drawn elevation sketch of hospital entrances and outdoor equipment in relation to Magnolia Street. His calculations indicated that less than four feet of street flooding could send water over the loading dock and into the hospital.

The generators themselves were on the second floor, but Yancovich identified a more vulnerable link: critical parts of the emergency power distribution system, including transfer switches, were at or near ground level. He warned his supervisor that relatively little water could disable most of the medical center and predicted that patients would have to be moved to the newer Clara Wing, where he believed the circuitry was better protected. The department installed floodgates and raised a vent for underground diesel tanks, but recommended additional work—including elevating transfer switches and pumps supporting medical air and vacuum suction. A partial electrical-work bid exceeded a quarter of a million dollars. Yancovich concluded that lack of capital made approval unlikely at the time, leaving the proposal on file for future consideration.

The distinction between a generator and a functioning emergency-power system became decisive. Memorial’s three 750-kilowatt generators had been designed and tested for short periods of backup operation, yet disaster plans expected them to support the hospital for at least three days. They had already run for two days when failures began. Staff who were not generator mechanics tried to address overheating and low oil pressure, move diesel, and reconnect electrical loads. Floodwater reached the lower levels containing transfer switches and distribution panels; attempts to reroute power raised concerns about overloading circuits, while another generator failed without available parts to repair it. At about two a.m. on August 31, the final generator surged and stopped. The failure was not simply a machine running out of power: it exposed the dependence of the whole system on components that prior analysis had identified as vulnerable to flooding.

Evacuation and care beyond the hospital walls

Preparedness also depended on what patients and staff could do outside the building. When the mayor ordered New Orleans evacuated, residents without cars were directed toward the Superdome, designated as a shelter of last resort, but officials knew transport plans had serious gaps, including too few drivers. People who could leave were already caught in traffic. Calls overwhelmed Acadian, the region’s largest ambulance company; many of the roughly two dozen ambulances made available were stuck on the interstate, and some began taking patients to the Superdome rather than out of town. At Chalmette Medical Center, ambulances did not return after the first group of critically ill patients left. These circumstances made evacuation an essential element of hospital readiness, not a task that could be improvised once roads were blocked.

Inside Memorial, the strain of evacuation was visible in smaller decisions as well as major failures. Patients who could be discharged were loaded onto boats, while many employees and family members also sought to leave. Some evacuees hesitated because they did not know where they were going or could not bring belongings. At the same time, an outpatient arrived through floodwater for a scheduled chemotherapy appointment, unaware that the hospital could not provide treatment. These encounters show how preparedness had to communicate the changed conditions and guide people whose expectations remained tied to ordinary hospital routines. In the wider accounting of the disaster, the delayed evacuation order, shortages of buses and drivers, uncoordinated rescue efforts, poor communications, and insufficient backup power and water all contributed to deaths and disruption of care.

Contrasting capacity and later changes

Charity Hospital faced conditions at least as severe as those at Memorial: it flooded, lost power and functioning plumbing, computers, telephones, and elevators, and had no helipad or corporate overseers to assist. It had roughly twice as many patients across its two campuses as Memorial, with fewer staff relative to patients. Yet fewer than ten patients died, and doctors reported that staff continued caring for patients in their rooms until the end. The hospital did not transfer all its patients until Friday afternoon, September 2, later than Memorial’s Thursday evacuation, but its staff had prepared for a Category Three hurricane and levee failure. With federal preparedness funds, the hospital had purchased portable generators, oxygen-powered ventilators, and a ham-radio system, and provided disaster training to security officers.

Preparation there also involved staff coordination and morale. Leaders held meetings every four hours in the lobby for everyone from physicians to janitorial staff. Workers staged a talent show by flashlight, painted, and laughed. Those practices did not erase shortages or danger; they helped sustain a workforce acting within them. The comparison makes preparedness both material and organizational: equipment mattered, but so did shared information, training, leadership, and the capacity to improvise without abandoning patient care.

The book traces the same unresolved problem beyond Katrina. In Haiti after the 2010 earthquake, a US disaster medical team struggled with oxygen supplies and equipment dependent on scarce generator fuel, recalling supply-chain failures after Katrina. Preparedness therefore extends beyond the hospital compound to the systems that replenish it. By the 2013 hurricane season, post-Katrina improvements at Ochsner Baptist Medical Center included restored generators and power-transfer switches, central-plant infrastructure raised onto a platform, a new water well to maintain cooling if city water failed, and a restored heliport with an elevator stop serving the new neonatal intensive-care unit. These changes translate the earlier warnings into specific protections. Their significance is not that disasters can be made predictable in every detail, but that risks already understood need not be left unaddressed.